Production of corrugated cardboard packaging | JSC “Gotek North-West”
Multi-storey residential complex “Life-Lesnaya”
Business center and hotel “Elkus” | JSC “The electronic Company “Elkus”
Technical Rooms of Tokovsky Tunnel
Specialized Bearings Factory | Timken OVK, LLC
Design of internal engineering systems
Implementation of engineering systems
The Solovetsky Monastery, Cultural Heritage Object
Installation of the ventilation system
Implementation of ventilation and conditioning systems, water supply and smoke removal
Installation of ventilation system, heating and ventilation automation, water supply and sewage
Implementation of ventilation and conditioning systems, fire sprinkler system and automation
Warehouse complex, Repischev St. | Real Construction, LLC
The N.I. Pirogov Plastic Surgery Clinic
Implementation of a set of engineering systems
Realization of mechanical engineering systems
Fuel Depot (building №60) | Nokian Tyres, LLC.
Installation of supply and exhaust ventilation and air conditioning system of the surgery center
Implementation of construction and installation works on low-voltage networks, power supply and dispatching of a fuel and lubricants warehouse
Performed by our employees
Luxury apartment hotel “Imperial Yacht Club”
Construction of 180 MW power unit No.1. Delivery, installation and commissioning of electrical equipment, EC&I, APCS.
Bulk Warehouse for Mineral Fertilizers | PJSC “PhosAgro”
Complex of works on reconstruction of the Yacht Club building, including installation of: heating system, pipeline system of technological equipment, water supply and sewage systems
Installation of ventilation system and ventilation automation
Business center “Stockholm”
Equipment supply and installation of video system
Implementation of engineering systems: aspiration, smoke removal, conditioning, sewage, cold water supply, hot water supply, fire-fighting water supply
Specialized Bearings Factory | Timken OVK, LLC
The Solovetsky Monastery, Cultural Heritage Object
Warehouse complex, Repischev St. | Real Construction, LLC
Performed by our employees
Fuel Depot (building №60) | Nokian Tyres, LLC.
The N.I. Pirogov Plastic Surgery Clinic
Design of internal engineering systems
Installation of engineering networks and technological equipment)
Implementation of construction and installation works on low-voltage networks, power supply and dispatching of a fuel and lubricants warehouse
Installation of supply and exhaust ventilation and air conditioning system of the surgery center
Installation of the ventilation system
Implementation of engineering systems
The Saint-Petersburg Paper Mill of Goznak
Performed by our employees
Performed by our employees
Overhaul and modernization of electrical equipment, EC&I, APCS and cable management
Electrical installation and installation of technological equipment)
Construction of a Daimler assembly and paint shops at the VAZ Factory
Performed by our employees
Performed by our employees
Construction of a 220 MW CHPP at ZAO Tikhvin Freight Car Building Plant and ISM LLC
Supply and installation of metal structures.
Construction of a coke-oven battery №11
Performed by our employees
General contracting for GIS building construction, installation of all engineering systems, Main building.
Construction of the Engine Factory (Hyundai WIA)
Performed by our employees
Cherepovets (Severstal PAO). General contracting for infrastructure facilities
General contracting for engineering networks.